Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Standpipe Systems and NFPA 25 Inspections in Drawings Walk the Riser, Run the Roof Test and Write It Up in the Same Order Every Time

The riser, hose valves, PRVs, the FDC, the flow test from the roof, the hydrostatic test, deficiencies and the report. Each topic has its own page: the drawing first, then what you need to remember. 64 illustrated pages.

GET THE 64 ILLUSTRATED PAGES

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach valve, test and reading drawn, with the explanation right beside it
64 illustrated pages64 illustrated pages in 8 parts, from the riser in one drawing to the pocket review of the numbers
Up-to-date sourcesNFPA 14 and NFPA 25, current editions, as adopted by your AHJ
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the numbers and steps you need to know:

Standpipes are tested for pressure and flow at the most remote hose outlet.
Standpipes are tested for pressure and flow at the most remote hose outlet.
FDC: 18–48 in above grade, two 2½-in inlets minimum, STANDPIPE sign in 1-in letters.
FDC: 18–48 in above grade, two 2½-in inlets minimum, STANDPIPE sign in 1-in letters.
Reducing cuts static and flowing pressure, restricting only flowing, master cuts a whole zone
Reducing cuts static and flowing pressure, restricting only flowing, master cuts a whole zone
Every 5 years, at the most remote outlet of each zone: design flow at design residual.
Every 5 years, at the most remote outlet of each zone: design flow at design residual.
Two most remote 2½-in outlets of the farthest riser, in each zone: 250 gpm each.
Two most remote 2½-in outlets of the farthest riser, in each zone: 250 gpm each.
Hydro every 5 years: 200 psi for 2 hours, or max + 50 psi when max is over 150 psi
Hydro every 5 years: 200 psi for 2 hours, or max + 50 psi when max is over 150 psi
Dry standpipe: 40 psi air for 24 h at acceptance, full drain after any water test
Dry standpipe: 40 psi air for 24 h at acceptance, full drain after any water test
500/250 gpm, 100/65 psi, 175 psi, 200 psi for 2 h, 0.433 psi/ft
500/250 gpm, 100/65 psi, 175 psi, 200 psi for 2 h, 0.433 psi/ft

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 60 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're in the stairwell on the 14th floor, in front of a hose valve with a pressure tag on it. You need to know if it cuts static pressure, flowing pressure, or a whole zone before you write a word on the report.

The manual gives you three paragraphs of definitions. Reducing, restricting, master, PRD: the words run together, and every colleague uses them a little differently.

Reducing cuts static and flowing pressure, restricting only flowing, master cuts a whole zone

In the book, that's one page. Three valves drawn side by side, each with its gauges: reducing cuts static and flowing pressure, restricting cuts only flowing, master cuts the whole zone.

Same with the FDC, the walkdown order, the flow test from the roof, the hydrostatic test and the deficiency write-up: each one has its own page.

You look at the valve, you know what it is, and you write it up right without going back to the manual.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Learn It

THIS
  • The manual: line after line
  • Valves and connections explained only in words
  • You show up at the building still unsure
A fire department connection supplies water to the standpipe system from a pumper. Its location, height, inlet size, thread type, check valve, drain and signage are all subject to requirements, which vary with the system type, the edition in force and the decisions of the local authority. Inspection should verify that it is visible, accessible, undamaged, capped, free of obstructions and correctly identified, and that any deficiency found is documented and reported to the owner for correction.
FOR THIS
  • The FDC in one labeled drawing
  • The heights and inlet sizes in a box
  • You see it and you get it
FDC: 18–48 in above grade, two 2½-in inlets minimum, STANDPIPE sign in 1-in letters.
CONTENTS

Take a Look at the 8 Parts and 60 Topics

The system at a glance, water supply and the FDC, hose valves and pressure control, the inspection walkdown, the flow test from the roof, hydrostatic and other tests, deficiencies and the report, and the field review with checklists: 64 pages, all illustrated.

IThe System at a Glance · pp. 5-11
  1. A standpipe in one drawing
  2. Standpipe vs. sprinkler: what changes
  3. Class I, II and III
  4. The five system types
  5. Wet vs. dry: what's inside the pipe
  6. Combined systems
  7. The numbers to keep in mind
IIWater Supply and the FDC · pp. 12-18
  1. Where the water comes from
  2. Height costs pressure
  3. The fire pump in one page
  4. The fire department connection (FDC)
  5. What a good FDC looks like
  6. Pressure zones in high-rise buildings
  7. Control valves on the supply
IIIHose Valves and Pressure Control · pp. 19-26
  1. The 2½-in hose valve
  2. Where the hose valves go
  3. The 1½-in hose station
  4. Why PRVs exist
  5. PRV, PRD and master PRV: not the same thing
  6. Reading a PRV setting
  7. The master PRV on the riser
  8. Caps, threads and adapters
IVThe Inspection Walkdown · pp. 27-34
  1. The order of the walkdown
  2. Control valves: open, sealed, supervised
  3. Gauges: what the needle should say
  4. Piping and hangers
  5. Hose connections floor by floor
  6. Hose cabinets and stations
  7. Signs and identification
  8. Dry systems: the extra checks
VThe Flow Test from the Roof · pp. 35-43
  1. Why the flow test exists
  2. Before you open a valve
  3. The flow test kit
  4. Which outlet is the most remote
  5. Static, residual, pitot
  6. Step by step on the roof
  7. From pitot psi to gpm
  8. Does it pass? A worked example
  9. When the numbers don't add up
VIHydrostatic and Other Tests · pp. 44-50
  1. The hydrostatic test in one page
  2. Setting up the hydro
  3. Reading the hydro gauge
  4. Main drain test
  5. Hose valve and PRV tests
  6. Dry standpipe trip and fill
  7. The schedule on one page
VIIDeficiencies and the Report · pp. 51-57
  1. Impairment, critical, noncritical
  2. The most frequent deficiencies
  3. How to write one deficiency
  4. Writing up a failed flow test
  5. Impairment procedure
  6. Talking to the owner and the inspector
  7. What to keep on file
VIIIField Review and Checklists · pp. 58-64
  1. The whole system again, at a glance
  2. Common mistakes on the job
  3. Quarterly checklist
  4. Annual checklist
  5. Flow test log
  6. Hydrostatic test log
  7. Pocket review: the numbers

One Page, One Topic, All Clear

Think of it this way:

It's the five-year flow test. You're at the roof outlet with the pitot kit, the owner's rep is waiting downstairs, and you need to know which readings to take, and in what order.

You open the book to Step by Step on the Roof and the sequence is drawn: static, open slowly, let it stabilize, pitot and residual, close slowly, record again. The next page turns pitot psi into gpm with a worked example.

Two most remote 2½-in outlets of the farthest riser, in each zone: 250 gpm each.

Same with the PRV types, the FDC, the hydrostatic test, the testing schedule and the deficiency write-up: each one on its own page.

Standpipe Systems Illustrated is 8 parts and 60 topics, all drawn, and it ends with quarterly and annual checklists, flow and hydrostatic test logs, and a pocket review of the numbers.

What you see drawn, you don't have to memorize.

What's Inside Standpipe Systems Illustrated:

Ipp. 5-11

The System at a Glance

A standpipe in one drawing, how it differs from a sprinkler system, Class I, II and III, the five system types, wet vs. dry, combined systems and the key numbers.

IIpp. 12-18

Water Supply and the FDC

Where the water comes from, why height costs pressure, the fire pump in one page, the FDC and what a good one looks like, pressure zones in high-rises and supply control valves.

IIIpp. 19-26

Hose Valves and Pressure Control

Know which valve you're looking at before you write a word: the 2½-in hose valve and where it goes, the 1½-in hose station, why PRVs exist, reducing vs. restricting vs. master, reading a setting, caps, threads and adapters.

IVpp. 27-34

The Inspection Walkdown

The walkdown in order: control valves, gauges, piping and hangers, hose connections floor by floor, cabinets, signs and the extra checks on dry systems.

Vpp. 35-43

The Flow Test from the Roof

Run the roof flow test without second-guessing: why it exists, prep and kit, finding the most remote outlet, static, residual and pitot, the sequence step by step, pitot psi to gpm and a worked pass/fail example.

VIpp. 44-50

Hydrostatic and Other Tests

The hydrostatic test, setup and gauge reading, the main drain test, hose valve and PRV tests, the dry standpipe trip and fill, and the full schedule on one page.

VIIpp. 51-57

Deficiencies and the Report

Impairment, critical and noncritical, the most frequent deficiencies, how to write one up, a failed flow test, the impairment procedure, talking to the owner and what to keep on file.

VIIIpp. 58-64

Field Review and Checklists

The whole system again at a glance, common mistakes on the job, quarterly and annual checklists, flow and hydrostatic test logs, and a pocket review of the numbers.

At the end of the book: Quarterly and annual checklists, flow test and hydrostatic test logs, and a pocket review of the numbers.

Plus: 2 Free Books

Standpipe Gauge & Flow Test Workbook

BONUS 1: «Standpipe Gauge & Flow Test Workbook»

Value on its own: US$ 17.90

Practice reading gauges and filling in flow and hydrostatic test logs with worked psi and gpm examples, so the numbers make sense before you're on the roof.

Standpipe Deficiencies Quick Cards

BONUS 2: «Standpipe Deficiencies Quick Cards»

Value on its own: US$ 14.90

Every common deficiency on one card each: the symptom, what it means and how to write it up, ready to check at a glance on the job.

Standpipe Systems Illustrated with 2 Free Books

  • Standpipe Systems Illustrated: 64 illustrated pagesUS$ 63
  • BONUS 1: Standpipe Gauge & Flow Test WorkbookUS$ 17.90
  • BONUS 2: Standpipe Deficiencies Quick CardsUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT STANDPIPE SYSTEMS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Standpipe Systems Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're new to standpipe jobs

You're new to standpipe jobs

You came up through sprinklers and now get sent to risers and hose valves. The book lays out the whole system, one drawing per topic, in the order you'll work it.

The flow test is on the calendar

The flow test is on the calendar

Before you go up to the roof, you review the sequence, the readings and the pitot math on two pages, with a worked example in psi and gpm.

The building is your responsibility

The building is your responsibility

As a building engineer, you keep the standpipe ready between inspections. You know what to look at, what counts as a deficiency and what to tell the owner.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT STANDPIPE SYSTEMS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Standpipe Systems Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I came up through sprinklers and now get sent to standpipe jobs?

Yes. It isn't a beginner course: it starts with the system in one drawing and goes straight to the walkdown, the tests and the report. It also works for building engineers who look after a standpipe between inspections.

Where does the content come from?

It follows the current editions of NFPA 14 and NFPA 25. Many AHJs still enforce an earlier edition or local amendments, so check which edition yours has adopted: where they differ, your AHJ has the final word, not the book.

Is this official material?

No. It's an independent illustrated reference, not affiliated with or endorsed by NFPA or any authority.

Does it replace training or the standard?

No. It doesn't replace your company's training, the manufacturer's instructions, the standards themselves or your AHJ. What it adds: the standard tells you what's required, the manual covers one product. The book draws where each part is, what to read, in what order, and how to write it up, one topic per page.

Are the practice exercises taken from an official test?

No. The workbook exercises and worked examples are written for this book. They aren't questions from any exam or official test, and the book doesn't come with a certificate, NICET credit or CEUs.

When and how do I get it?

The book and the 2 bonus books come as PDFs by email, to the address you enter at checkout.

Do I have to pay every month?

No. It's a one-time payment.

Can I have it on paper?

Yes. The PDF prints on regular letter paper, so you can keep the pages and checklists in the truck.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the standard with nothing sticking.

The PRV, the FDC and the roof test: you see them drawn, and that's it.

You walk into the building knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT STANDPIPE SYSTEMS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.